RM新时代官网网址
hotline:
010-53033961
中文
Home
About
News
Product
Service
Case
Contact
hotline:
010-59393252
×
China Post Express Logistics North China (Langfang) Land Mail Processing Center
time:2019-01-22
hits:4141次
source:正弘奧能
<p> <strong><span style="font-size:16px;">Project Name:</span></strong><span style="font-size:16px;"> China Post Express Logistics North China (Langfang) Land Mail Processing Center</span> </p> <p> <strong><span style="font-size:16px;">Project Location: </span></strong><span style="font-size:16px;">Guangyang Economic & Development Zone, Langfang</span> </p> <p> <strong><span style="font-size:16px;">Project Overview:</span></strong><span style="font-size:16px;"> The project is located in Guangyang Economic & Development Zone, Langfang. It has a construction area of 30,400 square meters. The project mainly constructs warehouses, call center complex buildings, loading and unloading platforms, etc. The total investment of the project is 452 million yuan. After the project is completed, 120 million pieces of mail will be processed annually.</span> </p> <p> <br /> </p> <p> <strong><span style="font-size:16px;">Project Features: </span></strong> </p> <p <span="" style=""><span style="font-size:16px;">1. Large window and door area, resulting in large heat transfer coefficient in the enclosure structure</span> </p> <p> <span style="font-size:16px;">2. Large temperature gradient inside the architecture, significant air stratification, which causes the top to be warmer and the bottom to be cooler, resulting in faster heat dissipation from the roof</span> </p> <p> <span style="font-size:16px;">3. Spacious building has a higher requirement of temperature, needing a faster heatiing rate</span> </p> <p> <span style="font-size:16px;"><span style="font-size:16px;">4. Doors open frequently due to the transportation need of the processing center, and the intrusion of cold wind consumes a lot of heat.</span><br /> </span> </p> <p> <span style="font-size:16px;">5. The ratio of the outer wall area and the floor area is relatively large, causing the external surface to have a greater impact on the natural convection of the interior space, which makes it easy to result in downward cold airflow in winter.</span> </p> <p> <br /> </p> <p> <strong><span style="font-size:16px;">Equipment Usage:</span></strong><span style="font-size:16px;">We have chosen 18 sets of IMPRESIND Tub-One gas-fired radiant heating products for this project, which fully reflects the advantages of using high-power gas-fired radiant heating equipment in large spaces.</span> </p> <p style="text-align:center;"> <p style="text-align:center;"> <img src="http://hzhonghua.com/Uploads/image/20190401/20190401153340_19324.jpg" width="700" height="525" alt="" /> </p> <p style="text-align:center;"> <img src="http://hzhonghua.com/Uploads/image/20190401/20190401153404_31936.jpg" width="700" height="525" alt="" /> </p> <p style="text-align:center;"> <img src="http://hzhonghua.com/Uploads/image/20190401/20190401153427_95009.jpg" width="700" height="525" alt="" /> </p> <p style="text-align:center;"> <img src="http://hzhonghua.com/Uploads/image/20190401/20190401153453_47754.jpg" width="700" height="525" alt="" /> </p> <span font-size:14px;line-height:2;"=""><strong><br /> </strong></span> <p> <br /> </p> </p>
prev:China Southern Airlines Daxing New Airport International Freight Terminal Project
Returns a list of
next:China Post Harbin Land Transport Mail Processing Center