RM新时代官网网址
hotline:
010-53033961
中文
Home
About
News
Product
Service
Case
Contact
hotline:
010-59393252
×
Airplane Hangar Project of Xinjiang Urumqi Aviation Production & Operation Base
time:2019-04-10
hits:7576次
source:正弘奧能
<p> <strong><span style="font-size:16px;">Project Name:</span></strong><span style="font-size:16px;"> Airplane Hangar Project of Xinjiang Urumqi Aviation Production & Operation Base</span> </p> <p> <strong><span style="font-size:16px;">Project Location: </span></strong><span style="font-size:16px;">Urumqi, Xinjiang</span> </p> <p> <strong><span style="font-size:16px;">Project Overview:</span></strong><span style="font-size:16px;"> The project is located to the east of Wuchang auxiliary road and west of the end of the runway of Urumqi Diwopu International Airport. The total construction area is 169,300 square meters, the apron area is 60,600 square meters (with 9 gate positions), and the total investment is 1.19 billion yuan. The construction content of the project includes a main building, an attendance building, maintenance hangars, aviation material warehouses, outdoor corridors, etc.</span> </p> <p> <br /> </p> <p> <strong><span style="font-size:16px;">Project Features: </span></strong> </p> <p <span="" style=""><span style="font-size:16px;">1. Large window and door area, resulting in large heat transfer coefficient in the enclosure structure</span> </p> <p> <span style="font-size:16px;">2. Large temperature gradient inside the architecture, significant air stratification, which causes the top to be warmer and the bottom to be cooler, resulting in faster heat dissipation from the roof</span> </p> <p> <span style="font-size:16px;">3. </span><span style="font-size:16px;">Doors open frequently, and the intrusion of cold wind consumes a lot of heat</span> </p> <p> <span style="font-size:16px;">4. </span><span style="font-size:16px;">The hangar is mainly used for airplane maintenance, therefore requiring more safety concerns.</span> </p> <p> <br /> </p> <p> <strong><span style="font-size:16px;">Equipment Usage:</span></strong><span style="font-size:16px;">We have chosen 23 sets of IMPRESIND Tub-One gas-fired radiant heating products for this project. The project is currently under rapid construction.</span> </p> <p> <span style="font-size:16px;"><br /> </span> </p> <p style="text-align:center;"> <img src="http://hzhonghua.com/Uploads/image/20190410/20190410224101_29811.jpg" alt="" /><br /> <br /> <img src="http://hzhonghua.com/Uploads/image/20190412/20190412171237_76426.jpg" alt="" /><br /> <br /> <img src="http://hzhonghua.com/Uploads/image/20190412/20190412171248_27347.jpg" width="700" height="525" alt="" /> </p>
prev:That's the first one
Returns a list of
next:China Southern Airlines Hangar Project at Daxing New Airport