RM新时代官网网址
hotline:
010-53033961
中文
Home
About
News
Product
Service
Case
Contact
hotline:
010-59393252
×
Phase A of the Production Base Project of Shenzhen Ganten Food & Beverage Co., Ltd.
time:2019-01-22
hits:4553次
source:正弘奧能
<p> <span style="font-size:16px;"><strong>Project Name:</strong></span><span style="font-size:16px;"> Phase A of the Production Base Project of Shenzhen Ganten Food & Beverage Co., Ltd.</span> </p> <p> <span style="font-size:16px;"><strong>Project Location:</strong></span><span style="font-size:16px;"> Qianxi County, Tangshan</span> </p> <p> <span style="font-size:16px;"><strong>Project Overview:</strong></span><span style="font-size:16px;"> <span style="font-size:16px;">Phase A of the production base project of Shenzhen Ganten Food & Beverage Co., Ltd.</span><span style="font-size:16px;"></span>, located Qianxi County, Tangshan, has a construction area of 51,400 square meters. This is the company's largest production base in the north of the company. Ganten is a group enterprise specializing in the production and operation of packaged drinking water. Its products are sold nationwide. It is also one of the largest export enterprises in its industry. It ranks among the "Top 20" of China's beverage industry and its product "Baisui Mountain" has become a "Leading Brand in China's Mineral Water Industry". The project integrates ecological demonstration projects, industrial tourism, and productive logistics. It is located at No. 1 Jingtian(Ganten) Avenue, Qianxi County. It focuses on the production and sales of bottled water. It introduces 11 high-speed automatic production lines from German Krones, with an expected annual production scale of 800,000 tons of pure water. (Rankings are taken from China Beverage Industry Association and Chinapp)</span> </p> <p> <br /> </p> <p> <span style="font-size:16px;"><strong>Project Features: </strong></span> </p> <p <span="" style="margin-top: 0px; margin-bottom: 0px; padding: 0px; outline: none; list-style: none; box-sizing: border-box; text-align: justify; white-space: normal;"><span style="font-size:16px;">1. Large window and door area, resulting in large heat transfer coefficient in the enclosure structure</span> </p> <p> <span style="font-size:16px;">2. Large temperature gradient inside the architecture, significant air stratification, which causes the top to be warmer and the bottom to be cooler, resulting in faster heat dissipation from the roof</span> </p> <p> <span style="font-size:16px;">3. Spacious building has a higher requirement of temperature, which needs a faster heating rate</span> </p> <p> <span style="font-size:16px;">4. The area of the outer wall and the floor is relatively large, causing the external surface to have a greater impact on the natural convection of the interior space, which makes it easy to result in downward cold airflow in winter.</span> </p> <p> <br /> </p> <p> <span style="font-size:16px;"><strong>Equipment Usage:</strong></span><span style="font-size:16px;">We have chosen 18 sets of IMPRESIND Tub-One gas-fired radiant heating products fo</span><span style="font-size:16px;"></span><span style="font-size:16px;"></span><span style="font-size:16px;">r this project,</span><span style="font-size:16px;"> which fully reflects the advantages of using high-power gas-fired radiant heating equipment in large spaces.</span> </p> <p> <span style="font-size:16px;"> </span> </p> <p style="text-align:center;"> <img src="http://hzhonghua.com/Uploads/image/20190401/20190401152253_39539.jpg" width="700" height="394" alt="" /> </p> <p style="text-align:center;"> <img src="http://hzhonghua.com/Uploads/image/20190426/20190426204824_10398.jpg" alt="" /> </p> <p style="text-align:center;"> <img src="http://hzhonghua.com/Uploads/image/20190401/20190401152436_96498.jpg" width="700" height="525" alt="" /> </p> <span font-size:16px;line-height:2;"=""></span> <p> <br /> </p> <br /> <p> <br /> </p>
prev:COFCO Coca-Cola Beverages (HLJ) Co., Ltd. Production Plant Project
Returns a list of
next:Benteler Automotive Systems (Tianjin) Co., Ltd. Plant Project?