RM新时代官网网址
hotline:
010-53033961
中文
Home
About
News
Product
Service
Case
Contact
hotline:
010-59393252
×
Company News
News
Technical Popularization
Beijing Leadway Power Co., Ltd can do a good job of heating commissioning, to ensure that cooperative enterprises heating as scheduled
time:2023-11-02
hits:1325次
source:正弘奧能
In November, many places in the north officially entered the heating season. In recent days, Beijing Leadway Power Co., Ltd has deployed in advance, arranged accurately, and successively sent a number of technical personnel to various cooperative enterprises to carry out comprehensive operation and debugging work on gas radiation heating equipment, power distribution system and control system, etc., to ensure that cooperative enterprises will be heated as scheduled this winter, safe heating and efficient heating.<br /> <br /> Since mid-October, the commissioning work of gas radiation heating system of <span><span>Beijing Leadway Power Co., Ltd</span></span> has been carried out in a tense and orderly manner in various cooperative enterprises. At the commissioning site of each project, technicians check the appearance of the equipment one by one, the waterproof interface of the side wall or roof, and the levelness of the radiation section. Check the line connection, check the operating status of the equipment and the working status of intelligent control, record the initial operating parameters; To ensure that the heating this winter is foolproof, to ensure the heating safety of cooperative enterprises and the stable operation of equipment.<br /> <br /> <br /> <div style="text-align:center;"> <img src="http://hzhonghua.com/Uploads/image/20231102/20231102110420_98931.jpg" alt="" /> </div> <div style="text-align:center;"> Checking the appearance of equipment </div> <div style="text-align:center;"> <br /> </div> <div style="text-align:center;"> <img src="http://hzhonghua.com/Uploads/image/20231102/20231102110435_20816.jpg" alt="" /> </div> <div style="text-align:center;"> Set heating parameters </div> <div style="text-align:center;"> <br /> </div> <br /> After the end of the debugging work, the technical staff also carried out equipment and system practical training for the staff of the cooperative enterprise, so that the participants can more intuitively understand and grasp the performance of the equipment and system, and ensure that the cooperative enterprise can run the heating equipment and system software normally and independently. At the same time, the technical staff of <span>Beijing Leadway Power Co., Ltd</span> will regularly understand the use of the equipment, and provide technical support for customers in the daily maintenance of the equipment, troubleshooting and other problems.<br /> <br /> <br /> <div style="text-align:center;"> <img src="http://hzhonghua.com/Uploads/image/20231102/20231102110452_85739.jpg" alt="" /> </div> <div style="text-align:center;"> System technical training </div> <br /> With the hard work and joint efforts of all the technical staff of <span>Beijing Leadway Power Co., Ltd</span>, the commissioning of gas radiant heating systems for industrial plants, airport hangars and other projects has been completed. In the process of heating commissioning of various projects, <span>Beijing Leadway Power Co., Ltd</span> continues to refine work measures, solid and meticulous winter heating work, so that local cooperative enterprises can rest assured, worry and peace of mind.<br /> <br /> <p> For a long time, <span><span>Beijing Leadway Power Co., Ltd</span></span> has been practicing the "customer-centric" brand concept with practical actions, constantly optimizing product quality, focusing on the implementation of standardized services, providing customers with high-quality products and services in each touch point of product delivery and commissioning services, helping industrial enterprises to achieve energy saving and consumption reduction, intelligent heating development goals. </p> <p> <br /> </p>
prev:Beijing Leadway Power Co., Ltd appeared at the 10th National Building Environment and Energy Application Technology Exchange Conference
Returns a list of
next:Beijing Leadway Power Co., Ltd meets the 2023-2024 heating season